The German plan of "Bauvorhaben 24", planned site nr 24. The rockets were assembled and filled up with fuel in the complex and then railed out to be launched at the red lines.
Long tunnels present much information.
Some equipment is present.
The mighty generator is still complete.
This part is reinforced with a steel shuttering.
In 2017 Henk Adriaanse made a guided tour to visit places that are closed for the regular visitor.
A vast tunnel system deep down was still under construction.
White safety helmets for the visitors. The guide wears a yellow one.
This part has already been reinforced with concrete.