On top of the first roof (2m thick), a V-shaped grid of small concrete beams was placed, filled up with an extra layer of 2 meters of concrete.
On top of that, supporting walls were built, about 2m high.
Finally, concrete beams were placed, in order create a hollow space above the re-inforced roof.
Eventually the whole roof would look like this.
Next page